Sirius SLT969WH 110cm Valentina Collection Ceiling Cassette Rangehood

User Manual - Page 7

For SLT969WH.

PDF File Manual, 16 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
SLT968 EM INSTALLATION
Take the product out of the packaging and place
it on a suitable surface: we suggest to use a soft
material like a sponge or a cloth.
This information is very important for the creation
of the plasterboard structure.
Installation entails the lowering of the plasterbo-
ard ceiling, as the appliance shall be installed at
a maximum distance of 2100mm from the oor in
order to ensure good operation and performan-
ces The hood can be installed at a minimum di-
stance of 300mm and at a maximum distance of
480mm from the solid ceiling.
In case ceiling lowering results greater than the
aforementioned maximum distance required, you
will need to use longer threaded bars.
In order to make installation operations easier,
we suggest to create only the metal structure clo-
se to the hood, without using the plasterboard.
Please remind that the recess which will house
the hood should be 1065x665mm and that the
weight of the plasterboard shall not rest on the
hood.
Provide the area where the hood is being in-
stalled with power supply and with the 150mm
diameter or similar section duct necessary to di-
scharge the air.
Draw the holes for installing the appliance on the
solid ceiling (Fig. 3). Drill the holes previously
outlined using an 8mm diameter twist drill and
secure the metric dowels and the threaded bars
supplied into the holes (g. 4).
It is possible to select the side of the hood where
the air suctioned can be discharged.
After having chosen the most suitable position,
prepare the ducting: an air outlet connection pie-
ce, with a diameter of 150 mm to be installed in
the side selected, is provided with the appliance.
(FIG. 5 - 6 - 7)
The standard conguration of this product has
the upper outlet ange - 200mm diameter - alrea-
dy installed. (g 8).
Bring the hood close to the ceiling and carry out
the electrical and the air outlet duct connection
as well.
Install the hood on the ceiling and secure it by
screwing the nuts supplied to the threaded bars.
(g. 9).
The plasterboard structure shall not rest on the
hood.
7
SLT969 INSTALLATION
Take the product out of the packaging and place
it on a suitable surface: we Suggest to use a soft
material, such as a sponge or a cloth.
Open the glass panel , rotating it as shown in Fig.
1, and remove the grease lters.
BEFORE INSTALLATION , IN ORDER TO AVOID
ANY POSSIBLE DAMAGE TO THE GLASSES,
WE RECOMMEND TO REMOVE THEM BY UN-
SCREWING THE EIGHT SCREWS SHOWN IN
FIG.2.
A recess shall be created , where the appliance
will be placed, which shall have a 1065 mm X 665
mm rectangular opening and depth ranging from
200mm to 280 mm.
INSTALL THE HOOD ON THE CEILING, CON-
NECT THE CANAL SYSTEM FOR THE AIR
OUTLET, SET THE ELECTRICAL CONNEC-
TION AND THEN COMPLETE THE PLASTER-
BOARD STRUCTURE.
The recess shall be provided with a socket and a
round pipe of 150mm diameter, or a similar sec-
tion, for the air outlet. Drill the holes on the ceiling
, as shown in Fig. 10, insert the plastic plugs into
the holes made, and then x the ceiling brackets
as shown in Fig. 11. The ceiling brackets are tele-
scopic , so their height can be adjusted at 80 mm
between the ceiling and the hood.
You can choose one of the three air outlets shown
in Fig. 12: t the air outlet plastic ange in the de-
sired outlet; the remaining outlets shall be closed
with the specic metal caps , as shown in g. 12.
Bring the hood close to the brackets previously -
xed and then connect the appliance to the supply
mains. Secure the hood to the ceiling, by using
the screws supplied, as shown in Fig. 13.
Loading ...
Loading ...
Loading ...