10 Cyclone Canopy Installation - English
Measure Installation Height
Determine the required distance between the ceiling and the top of
the blower box (D) based upon ceiling height (C), desired height of
hood above cooktop (A) and unit height (B):
D=C-A-B
e height D is the installation height of the mounting bracket
(Figure 3) . If the installation height D is less than 22”, the mounting
bracket and duct covers may need to be cut. e duct cover needs a
clean cut and must to be cut from bottom end sides for both inside
and outside pieces. For optimal clearance, the minimum mounting
should be 30” above the cooking surface.
C/L
A
C
D
B
Blower Top Box
Range Hood Bottom
When building framework, always follow all applicable
construction codes and standards.
WARNING
Install Mounting Bracket
1. Modify ceiling structure at hood location. Install 2 × 4
cross framing between ceiling joists using ceiling mounting
bracket dimension (Figure 4). e framework must be sized
to support the total weight of the hood.
2. Finish ceiling surface. Be sure to mark the location of the
ceiling joists and cross framing. Bring house wiring through
nished ceiling.
10 ½”
11 ¼”
9 ⅝”
8 ¾”
ø 6 ¾”
3 ⅜”
4 ⅜”
1 ⅜”
Upper Mounting
Bracket
Ceiling Joists
Cross Framing
6” Round
Ductwork
ISLAND HOOD INSTALLATION
At least two installers are required due to the weight and
size of the hood.
is hood should be installed to a nished ceiling.
Turn o power circuit at the service panel before wiring
this unit.
All electrical work must be done by a qualied electrician
in accordance with all applicable codes and standards.
is range hood must be properly grounded.
CAUTION
Figure 4.
Figure 5.