Miele PWM 908 [EL DP] Professional Washing Machine

Operating and Installation Instructions - Page 72

For PWM 908 [EL DP].

PDF File Manual, 108 pages, Read Online | Download pdf file

PWM 908 [EL DP] photo
Loading ...
Loading ...
Loading ...
Installation and connection
*INSTALLATION*
72
Installation surface
A concrete floor is the most suitable in-
stallation surface for this machine. It is
far less prone to vibration during the
spin cycle than wooden floorboards or
a carpeted surface.
The machine must be level and se-
curely positioned.
To avoid vibrations during spinning,
the machine should not be installed
on soft floor coverings.
If installing on a wooden joist floor:
Install the machine on a plywood
base (at least 2' 3 9/16" x 1' 11 5/8" x
1 3/16" (70x60x3cm)). The base
should span several joists and be
bolted to the joists and not only to the
floorboards.
Tip: If possible, install the machine in a
corner of the room. This is usually the
most stable part of the floor.
Removing the shipping struts
Removing the left-hand shipping
strut
Open out the cover and use the
wrench supplied with the washing
machine to turn the shipping strut
90°.
Pull out the shipping strut.
Loading ...
Loading ...
Loading ...