Liebherr SGNPES4365LH 315L Upright Freezer

User Manual - Page 13

For SGNPES4365LH.

PDF File Manual, 26 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
Fig. 24
u
Slide the soft stop mechanism on the bearing bracket side at
an angle into the slot as far as the limit stop.
Fig. 24 (1)
u
Slide the unit in fully.
w
The unit is positioned correctly when the rib on the soft stop
mechanism is in the guide in the housing.
u
Tighten the screw with the T15 screwdriver.
Fig. 24 (2)
Fig. 25
The door is open 90°.
u
Turn the hinge in the bearing bracket.
Fig. 25 (1)
u
Insert the bolt in the bearing bracket and hinge. Make sure
that the catch mechanism is sitting correctly in the groove.
Fig. 25 (2)
u
Remove the locking device.
Fig. 25 (3)
u
Slide on the cover.
Fig. 25 (4)
Fig. 26
u
Position the bearing bracket and engage. If necessary push
apart carefully.
Fig. 26 (1)
u
Position the panel.
Fig. 26 (2)
u
Swing in the panel and click into place.
Fig. 26 (3)
u
Slide on the external cover.
Fig. 26 (4)
u
Close the upper door.
Fig. 26 (5)
4.4 Water connection*
WARNING
Danger of electric shock!
u
Disconnect the appliance by unplugging it before you
connect it to the water line.
u
Shut off the water supply before you connect the water feed
lines of the IceMaker.
u
The connection to the drinking water system may be carried
out only by a qualified gas fitter and plumber.
WARNING
Risk of poisoning!
u
The water quality has to comply with the drinking water ordi-
nance of the respective country (e.g. 98/8
u
Connect to the drinking water supply only.
u
The IceMaker serves exclusively for making ice cubes in
household quantities and has to be operated with water suit-
able for the purpose.
Fig. 27
a b c M
~ 1100 mm ~ 700 mm ~ 110 mm Solenoid valve
- The water pressure must be between 0.15 MPa and
0.6 MPa (1.5 bar - 6 bar).
Putting into operation
* Depending on model and options 13
Loading ...
Loading ...
Loading ...