Loading ...
Loading ...
Loading ...
![](https://files.manualsfile.com/60905116-jkd915ck2cc/bge.png)
Installationofthe warming drawer.
Read these instructionscompletely and carefully.
ProvideCabinetSupport
2"x 4" orequivalentrunners
231//'
m
i
i
i
i
i
i i
i
i
i
i
i
i
i
i
i
i
i
i
I__ I_ 22'_127'c J
2"x4" orequivalentrunners
231//'
30'_ J
IMPORTANT'. When installed below a single c,r
double oven, check to be sure that any oven
SUl)l)orts above the cutout do not obstruct the
23½" required depth of the wamfing drawer
ctltOtlt.
_)i_A 2" minimum clearance between oven
and warming d_'awer CIItOtlLS are required.
Additional clearance may be required if
2 x 4 blocks are used to support runners or
solid floor of the oven above.
!i_:Tile warming drawer may be SUl)ported by
( •
either a solid bottom, 2 x 4 w 2 x 2 framers.
!i_:Tile support must be level and rigidly
mounted, flush wifll file bottom edge
of file cutout.
There is no way to level the drawer once #
has been installed. Be sure supports are level
_: Tile entire weight of tile dKiwer is supported
by the framers or solid floor and inust be
capable of supporting 150 lbs.
Step l--Install Anti-Tip Brace
WARNING: ANTI- TIP PRECAUTIONS:
The anti-tip brace must be installed to prevent
the drawer from tipping forward when opened
and loaded.
Failure to do so could result in personal injury.
_ nstall2x4or2x2anti4ipbrace
againstrearcabinetwail 9"
fromfloorto bottom_ofbrace
L=._=.J
,,, 2x4or2x2runners "_
orsolidbottom
14
Loading ...
Loading ...
Loading ...