Owner's Manual
Inspection, Cleaning, and
Maintenance
WARNING! ALWAYS MAKE SURE THE ENGINE POWER SWITCH IS iN ITS
_ OFF" POSiTiON. DISCONNECT THE SPARK PLUG WiRE FROM THE ENGINE.
AND ALLOW SUFFiCiENT TiME FOR THE ENGINE AND GENERATOR TO
COMPLETELY COOL BEFORE PERFORMING ANY iNSPECTiONS,
MAINTENANCE, OR CLEANING.
= Before each use, inspect the generator. Check for:
Loose screws
Misaligned or binding moving parts
Cracked or broken parts
Damaged electrical wiring
Any other condition that may affect safe operation.
= If an engine problem occurs, have it checked by a qualified service technition before further use.
Do not use damaged equipment.
Before each use, make sure the engine's oil and gas levels are adequate. If necessary, fill the
crankcase until the oil level is even with the oil hill hole and/or fill the fuel tank.
= Before each use, remove all debris with a soft brush, rag, or vacuum.
Lubricate all moving parts using a premium
quality, lightweight machine oil.
= Oil has to be drained after the first 20 hours of use.
This is the break in period. Then after every 50 hours
of use, drain the old engine oil and replace with a
high quality SAE 10W-30 grade engine oil.
Upper Levee
= Every 300 hours of use, have a qualified, certified
technician perform thorough maintenance on the
generator and engine.
For long term storage, either drain fuel into
suitable container or add a fuel preservative/
stabilizer (not included) to prevent fuel
breakdown.
7500W Generator
Installation
NOTE: PRIOR TO POWERING TOOLS AND EQUIPMENT MAKE
SURE THE GENERATOR'S RATED VOLTAGE, WATTAGE AND AMPERAGE
CAPACITY IS ADEQUATE TO SUPPLY ALL ELECTRICAL LOADS
THAT THE UNiT WILL POWER. iF POWERING EXCEEDS THE GENERATOR'S
CAPACITY, iT MAY BE NECCESSARY TO GROUP ONE OR MORE OF THE
TOOLS AND/OR EQUIPMENT FOR CONNECTION TO A
SEPERATE GENERATOR.
Electrical and other permits may be required for the installation of emergency power systems.
Investigate your local building and electrical codes before installing this unit. Installation must be
completed by licensed contractors.
WARNING! THE GENERATOR WEIGHS APPROXIMATELY 195 POUNDS. USE
CARE AND THE PROPER LIFTING OR HOiSTiNG EQUIPMENT WHEN MOVING
iT TO THE iNSTALLATiON LOCATION. ALWAYS CONNECT HOIST LINES TO
THE FRAME OF THE GENERATOR.
General Location
Make sure to locate and install the generator outdoors where cooling air is readily available.
Install the generator so that the air inlets and outlets are not blocked by obstructions such as
bushes, trees, or snow drifts. Locating it in the path of heavy winds or snowdrifts may require
the placement of a barrier for protection. In normal weather conditions, the air vent should face
the prevailing wind direction.
Install the generator on a concrete slab or other area where rain drainage or flood waters can
not reach it.
Generator placement should allow four feet of access to all sides for maintenance.
Place the generator as close as possible to the electrical tools and equipment being powered to
reduce the length of extension cords.