GE - General Electric JVB36WBB GE range hood

User Manual - Page 13

For JVB36WBB.

PDF File Manual, 40 pages, Download pdf file

Loading ...
Loading ...
Loading ...
Installing the Electrical Wiring
[] MomH a s_anda_d wiring box, wi_h _-p_onged,
120 vdL 60HZ omieL insk]e d_e (abine_
Make sme the downdrafl'g power cord can
[]
[]
Rm_ fl_e appropriate po_ er cable imo fl_e
cabinet an(] (:()nnect it t() the o!]t]et.
Plug tile downdrafl's power cord into tile
omiet.
For tocM Insta#ation
Theconduit orl the blo_xer/3-of suFicierlt /erlgth to connectto
the downdf_fl when the blower is mounted in the cabinet and
for some/rlstallst/ons urlder the floor
Plug die blowe5 conduit into die mating connector
on the bottom of wising con_pmtment covey on the
down(karl, ffasten the vds:ebox to the main refit
wiring comp>wmlem _dth die screws pro@led.
For Remote Installations
If the blower conduit is not long enoughto reach the wiHr_q
compar_Tnentorl the dowrldr_lfi,the leads carl be extendet_
[] Cm the b]o_er lea(Is ap[)roximate]y 3" fl:om
tile plug on tile end of the b]o_ er 5:on(]uit.
I:)oX,4, _))_x _ 3-Wireconnector
Blowerwife
Blower_ _
{ onduit
[] Remove tile wis:e box and conduit fitfingflom
tile end of tile blo_ es conduit b} loosening tile
screw on tile fitting.
Mountingscrew ___ __o
Wire to outdoor / _J J
enclosure ,__ J jJ
"_ 3-Wire
connectors
Blowerwire box Wirenuts
[]
[]
[]
[]
[]
Saxe the wive box and plug to complete tile
5:onne(fion at the (]own(]_aft vent in the ]louse.
Use electsk:al (able _m(] conne(toFs that
(:onfom_ to local codes ( 14 gmlge rain. is
recommended), Att_wh tile wise box removed
flom die blower conduit to die end of the wis:e
rml at the venL Attach the plug an(] 3" ]ends to
the cable at the (]own(kn_ vent. Insert die plug
into the nlatin_ pbl_ on the re]lit, Attach wile
box _lt]l scsews to the vent.
Install appropriate eles:tvic_d box sddl conduit
C ( 5 55n e c{ o5"s 55 e f!5" t ]le 1) ] (5we 5",
Ches:k fllat tile 5ed plastic anti-short bushing is
ses:med in file end 5)_tile con(brit. ]install the
1)]o_es csm(]uh into the con(]uit 5:onnectsn on
die eles:{fis:al box.
Att_ch the gseen gsomld lead flom tile blower
to tile groined lead of tile _dfing of tile
(]()wn (]faf_ vent.
[] Connes:t die neutral and })55wetleads flom die
blower t55the leads fl55m the (](5_n(]r:4ft _ent.
Installing the Cooktop
Align the (ooktop with the down(karl and
fhsten ( ooktop in pla(e.
NOTE:Accurate alignment of cooktop and downdraft is
necessary to ensure that there is not interference when
air vent is raised and lowered. There should be a gap of
1/16"- 1/8" between the back of the cooktop and the
front of the downdraf_ cover
/3
Loading ...
Loading ...
Loading ...