Loading ...
Loading ...
Loading ...
Testing
Warning: Before proceeding, make sure cemented joints have reached the
recommended curing time (varies according to manufacturer).
1. Ensure the solenoids on the valves are fully closed (turn clockwise
until hand-tight).
2. Turn on sprinkler supply line and check manifold and valve for leaks. If
any leak occurs, LIGHTLY tighten connections with channel locks until
the leak stops. DO NOT over-tighten swivels.
3. Turn solenoid counterclockwise 1/4 turn until water flows out—run for
20 seconds and turn clockwise to retighten. Repeat with all valves.
4. Check that the sprinkler timer is plugged in and/or the circuit breaker
is on. Run each station manually from the timer to verify electrical
connection to the valve.
Loading ...
Loading ...
Loading ...