Loading ...
Loading ...
Loading ...
HOW TO REPLACE YOUR SHARPENING STONE
Model_358-350870 (Craftsman 2.1 PS) Only Model 358-350880 (Craftsman.2.3 PS/VL) Only
Figure 16, Remove guide'bar screw and bar clamp; Loosen
chain tension adjusting screw to relieve chain tension. Slip
bar off adjusting pin and slide bar back towards sprocket as
far as possibleand remove chain.
Fig. 16
Figure 17, After guide bar clamp isremoved, CLEAN inside
of clamp thoroughly. Slide stone carrier assembly left to
the sharpening position, Remove oscillating knob and stud
(No, 1, Figure 17) by turning counterclockwise. Usea 5/16
open end wrench on flats located at extreme bottom end of
oscillating knob, (Stud is threaded into stone carrier
assembly.)
Fig. 17
Figure 18,_Slide stone carrier (No. 1) out of bar clamp and
off pivot pin (No. 2). Clean pivot pin and place two drops
of oit on shaft and spread with finger. Replace new stone
carrier (No. 1) on pivot pin (No. 2) and slide in position, Be
surethat adjusting arm (No. 3) isplaced under adjusting arm
of depth adjusting block, (No. 4). Replace oscillating knob
,and stud and tighten securely. (Use 5/16 end wrench to
tighten 1/4 turn after finger tight.) Flats located at extreme
bottom of oscillating knob will accommodate 5116 end
wrench ................
Fig. 18
Loading ...
Loading ...
Loading ...