Loading ...
Loading ...
Loading ...
www.usaprocom.com
200159-01B
12
INSTALLATION
BUILT
-
IN FIREPLACE INSTALLATION
Figure 9 - Rough Opening for Wall
Installation
Figure 7 - Clearance to Combustibles
Figure 8 - Fireplace Clearances
WARNING: Do not allow any
combustible materials to overlap
the rebox front.
WARNING: Do not allow
combustible or noncombustible
materials to cover any necessary
openings like louvered slots.
WARNING: Never modify or
cover the louvered slots on the
front of the rebox.
Built-in installation of this replace involves
installing replace into a framed-in enclosure.
This makes the front of the replace ush
with wall. If installing a built-in mantel above
the replace, you must follow the clearances
shown in Figure 7.
NOTICE: Surface temperatures
of adjacent walls and mantels be-
come hot during operation. Walls
and mantels above the replace
may become hot to the touch.
If installed properly, these tem-
peratures meet the requirement
of the national product standard.
Follow all minimum clearances
shown in this manual (see Figure
4, page 9 and Figure 8).
1. Frame in rough opening. Use dimensions
shown in Figure 9 for the rough opening.
If installing in a corner, use dimensions
shown in Figure 10 (page 12) for the rough
opening. The height is 19", which is the
same as the wall opening above.
2. Carefully set replace in front of rough
opening with back of replace inside wall
opening.
1/4" Clearance to Facia
3/8" Clearance to Sides, Back and Top
15
5
/
8
"
16"
28"
5"
4"
6"
8"
10"
12"
To
Ceiling
Hood Top
Fireplace
Safe Zone
12"
9"
6"
3"
1
1
/
2
"
1
3
/
4
"
Slope
Factor
19
3
/
5
"
26
1
/
8
"
11"
9
1
/
4
"
15
5
/
8
"
Loading ...
Loading ...
Loading ...