Loading ...
Loading ...
Loading ...
Window Installation
Window opening measurements:
A
B
A. Width
B. Height
Remove Packaging Materials
NOTE:The air conditioner must set upright for
one hour before operating.
Remove and dispose of/recycle packaging
materials. Remove tape and glue residue from
surfaces before turning on the air conditioner.
Rub a small amount of liquid dish soap over the
adhesive with your fingers.Wipe with warm
water and dry.
Do not use sharp instruments,rubbing alcohol,
flammable fluids,or abrasive cleaners to
remove tape or glue.These products can
damage the surface of your air conditioner.
Handle the air conditioner gently.
Unpack the Air Conditioner
Prepare Air Conditioner for Installation
MODEL
Dimension
A(inch) Min
31¼”(79.4cm)
38”(96.5cm)
40”(101.6cm)
17
”(44.1cm)
28
”(72.1cm)
20¼”(51.4cm)
14500-18000 BTU
24000 BTU
A(inch) Max
B(inch) Min
1. Remove two front attachment screws.Separate the outer
Unpack unit on the floor next to installation location.
case from the front with a putty knife at the catch points
designated by the arrows.
2.14500-18000 BTU:Remove the four screws on both sides
of the outer case.
24000 BTU:Remove the two screws on both sides of the outer
case.
3.Using the basepan handle, slowly and evenly pull chassis
out from outer case.
NOTE: Cover putty knife blade with masking tape to guard
against damage of the unit finish.
CAUTION:Never expose plastic front or grille to extreme
temperatures.
Loading ...
Loading ...
Loading ...