Installation
23
EN
Connection of the appliance to the gas
supply must be in accordance with the
requirements of AS5601. A ½” BSP
connector at the inlet is recommended and
the gas supply line to the appliance must be
of adequate length to allow sufficient
withdrawal of appliance for service or
disconnection and be:
1. annealed copper pipe or;
2. flexible hose according to AS/NZ1869
& be at least Class “B”, 10 mm diameter.
The appliance must be installed with
provision to allow the gas to be turned off
and disconnected for servicing and removal
of the appliance as required from the gas
supply. Before the appliance is operated
make certain all relevant parts are placed in
the correct position.
On completion of the installation, the
installer MUST check for gas leaks and test
each burner individually for the correct
flame. Once all burners have been tested
individually, turn all burners on together.
Warranty service calls do not cover these
adjustments!
To check the operating pressure of the
appliance it is recommended at least 2
large size burners are used. Ensure
appliance is secured to wall when
installation is completed.
N.G. The regulator supplied must be fitted
to the ½ BSP thread at the rear of the
appliance. An approved manual shut-off
valve must be installed. The N.G. regulator
must be checked and adjusted to 1.0kPa
after installation.
U.L.P.G. Can be connected to the inlet
fitting directly. The pressure must be
checked to ensure it is operating at
2.75kPa. A separate test point fitting must
be installed between the piping & the
appliance for the pressure to be checked to
ensure it is operating at 2.75kPa.
Connection to liquid gas
Use a pressure regulator and make the
connection on the gas cylinder following
the guidelines set out in the regulations in
force.
Make sure that the supply pressure
complies with the values indicated in the
paragraph ““Burner and nozzle
specifications tables””.