Loading ...
Loading ...
Loading ...
Installation
22
With steel hob
To prevent leakage of liquid between the
frame of the hob and the work surface, put
the insulating seal provided in position
before assembly.
1. Refer to the dimensions in the figure,
bearing in mind that the long front side
must brush against the hole.
2. Use light pressure to make the seal stick
to the edge around the hole cut in the
worktop.
3. Carefully trim the surplus edge away
from the seal.
5.5 Gas connection
General informations
This appliance is suitable for installation with
Natural Gas or ULPG (propane/butane).
Refer to “Burner and nozzle specifications
tables” paragraph for the relevant burner
pressure and appropriate injector sizes.
When the appliance is to be connected to
Natural Gas then the pressure regulator
supplied must be fitted to the gas inlet. A test
point (for checking the gas pressure) is
supplied either with the regulator or as a
separate fitting in the case of ULPG
(propane) appliances.
Gas leak
Danger of explosion
• After carrying out any operation, check
that the tightening torque of gas
connections is between 10 Nm and 15
Nm.
• If required, use a pressure regulator that
complies with current regulations.
• At the end of the installation, check for
any leaks with a soapy solution, never
with a flame.
• Installation with flexible hose must be
carried out so that the length of the
piping does not exceed 1,2 metres
when fully extended; make sure that the
hoses do not come into contact with
moving parts and that they are not
crushed in any way.
• The hoses should not come into contact
with moving parts and should not be
crushed in any way.
Loading ...
Loading ...
Loading ...