User Manual - Page 190

For 2016 CLUBMAN W/ MINI CONNECTED.

Loading ...
Loading ...
Loading ...
7 Connector/cable for socket
8 Connection hose
Filling the tire with sealant
1. Shake the sealant container.
2. Pull filling hose completely out of the cover
of the sealant bottle. Do not kink the hose.
3. Slide the sealing container into the holder
on the compressor housing, ensuring that it
engages audibly.
4. Screw the filling hose of the sealant con‐
tainer onto the tire valve of the nonworking
wheel.
5. With the compressor switched off, insert
the plug into the power socket inside the
vehicle.
6. With operating readiness switched on or
the engine running, switch on the compres‐
sor.
Let the compressor run for max. 10 minutes to
fill the tire with sealant and achieve a tire infla‐
tion pressure of approx. 2.5 bar.
While the tire is being filled with sealant, the
tire inflation pressure may sporadically reach
approx. 5 bar. Do not switch off the compressor
at this point.
Seite 190
MOBILITY
Wheels and tires
190
Online Edition for Part no. 01 40 2 964 571 - X/15
Loading ...
Loading ...
Loading ...