Loading ...
Loading ...
Loading ...
17
INSTALLATION
EN
to the wall by tightening the anchoring screw
d
all the way.
8
Plug the power cord into the power outlet.
NOTE
The charging station can be removed as needed.
To remove it, hold the floor stand dock steady
and pull up on the charging station.
Using Double-Sided Tape to Secure
the Appliance
1
Use the double-sided tape
a
to attach the wall
anchoring block
b
to the charging station.
Remove the centre section of double-sided
tape before attaching it to the wall
anchoring block.
2
Attach the second piece of double-sided tape
to the other side of the wall anchoring block to
secure it to the wall.
Do not use double-sided tape on wallpaper.
Wall-Mounted Installation
For wall-mounted installations, the charging
station must be attached securely to the wall using
the provided(short) wall anchoring screws.
The detachable nozzle storage cannot be
attached to the charging station in a wall-
mounted installation.
1
Connect the power adapter to the port on the
back of the charging station.
2
Drill 2 holes and insert the drywall anchors(if
needed) at least 1 m from the floor and near
enough to easily reach a power outlet.
Before drilling, make sure that there are no
pipes or electrical wires inside the wall at the
desired location.
For drywall anchor: use 6.5 mm drill bit
For concrete or wall stud: use 3 mm drill bit
global_main.book.book Page 17 Monday, July 13, 2020 4:53 PM
Loading ...
Loading ...
Loading ...