Loading ...
Loading ...
Loading ...
STACKING THE WASHER AND
DRYER (if desired) (cont.)
Installation Instructions
INSTALLATION PREPARATION
Remove the packaging.
Flatten the product carton to use as a pad to
lay the dryer down on its side. Continue using
the carton to protect the finished floor in front of
the installation location.
KIT GE FL STACK CONTENTS
Right hand bracket
Left hand bracket
4 rubber pads
4 #12 x 1” screws
4 #8 x 1/2” screws
TOOLS YOU WILL NEED
Phillips screwdriver
Open-ended wrench
Pliers
Gloves
Level
INSTALLING THE STACK BRACKET
KIT
REMOVE THE DRYER LEVELING LEGS
A. Carefully lay the dryer on its side. Use the packing
material so you don’t scratch the finish on the
dryer.
1
B. Use an open-end wrench or pliers to remove the
dryer leveling legs.
Back out and remove
all 4 leveling legs
INSTALL RUBBER PADS TO DRYER
BASE
Locate the 4 rubber pads in the parts package.
Remove the adhesive backing and firmly place
over on the bracket where you removed the
leveling legs.
2
41
Loading ...
Loading ...
Loading ...