Loading ...
Loading ...
Loading ...
English - 13
SETTING UP
3. Take out the lower basket (2) by lifting the
basket up from the rail system.
(2)
4. Press the fixing hook of the rail system.
5. Holding the top of the Freezer Drawer, pull it
out all the way, and then remove it from the rail
system.
CAUTION
Be careful not to scratch or dent the sliding rail by
letting it strike the floor.
CAUTION
Make sure that you mount the freezer basket in the
right position when removing / installing the freezer
door. Failing to do so may result in the door not
opening or closing properly.
RE-ASSEMBLE THE FREEZER
DRAWER
To reattach the drawer after you have moved the
fridge to its final location, assemble the parts in
reverse order.
DA68-03028A-06.indb 13 2015. 11. 5. �� 8:09
Loading ...
Loading ...
Loading ...