Loading ...
Loading ...
Loading ...
14
49-80759
INSTALLATION INSTRUCTIONS
Installation Instructions
FINAL INSTALLATION AND OPERATION CHECKLIST –
Do these in the following order:
1
Remove all packaging material (protective film, labels, tape, cardboard).
2
Raise the cooktop and remove any packaging material, and confirm wiring is not pinched nor in
contact with moving parts.
3
Confirm the cooktop is grounded.
4
Remove all items from the top of the cooktop surface.
5
Confirm the circuit breaker is closed (RESET) or the circuit fuses are replaced.
6
Confirm power is in service to the building.
7
Turn on each of the surface units (one at a time) to confirm that heating results – do not touch the
surface unit – then turn off the surface unit. If heating is not detected, recheck the cooktop wiring
connections. If change is required, retest again. If no change is required, have the building wiring
checked for proper connections and voltage.
8
Be sure all cooktop controls are in the OFF position before leaving the cooktop.
Loading ...
Loading ...
Loading ...