Loading ...
Loading ...
Loading ...
444
INSTALLATION REQUIREMENTS
Tools and Parts
Gather the required tools and parts before starting installation
Tools Needed
Phillips screwdriver
Parts Needed
Custom Overlay Door Panel—See “Overlay Panel—Rear
View.
Hardware (Optional)
Parts Supplied
M4 x 14 wood screws (8)
Location Requirements
NOTES:
For the beverage center to be flush with the front of the base
cabinets, remove any baseboards or moldings from the rear
of the opening. See “Product Dimensions” and later in this
section “Opening Dimensions.”
It is recommended that you do not install the beverage
center near an oven, radiator, or other heat source.
Do not install in a location where the temperature will fall
below 55°F (13°C). For best performance, do not install the
beverage center behind a cabinet door or block the base
grille.
Opening Dimensions
Height dimensions are shown with the leveling legs extended
to the minimum height.
NOTE: When leveling legs are fully extended, add ⁵⁄₈" (15 mm)
to the height dimensions. See “Product Dimensions.”
If the floor of the opening is not level with the kitchen floor,
shim the opening to make it level with the kitchen floor.
Product Dimensions
Height dimensions are shown with the leveling legs NOT
extended.
The power cord is 60" (1.52 m) long.
Front View
WARNING
Explosion Hazard
Keep flammable materials and vapors, such as
gasoline, away from beverage center.
Failure to do so can result in death, explosion, or fire.
1
/
4
" (6.35 mm)
2
1
/
2
" (63.5 mm)
Critical Dimensions:
A.14
³⁄₄
" (375 mm) utility opening
B.24" (609.6 mm) minimum opening width
A
34
3
/8" (873 mm) min.
35" (889 mm) max.
B
14
3
/4"
(375 mm)
1
/2"
(13 mm)
24
" (609.6 mm) min.
24
"
(609.6 mm)
min.
Loading ...
Loading ...
Loading ...