Loading ...
Loading ...
Loading ...
Installation
98
The nozzles not provided are available at Authorised Service Centres.
8 LPG G30/31 AUX SR R UR-3c
Rated heating capacity (kW) 1.05 1.8 3.0 3.5
Nozzle diameter (1/100 mm) 50 65 85 94
Pre-chamber (printed on nozzle) ----
Reduced flow rate (W) 400 500 800 1600
Rated flow rate G30 (g/h) 76 131 218 255
Rated flow rate G31 (g/h) 75 129 214 250
9 LPG G30/31 AUX SR R UR-3c
Rated heating capacity (kW) 1.1 1.8 3.0 3.5
Nozzle diameter (1/100 mm) 50 65 81 91
Pre-chamber (printed on nozzle) ----
Reduced flow rate (W) 450 550 800 1600
Rated flow rate G30 (g/h) 80 131 218 255
Rated flow rate G31 (g/h) 79 129 214 250
10 LPG G30/31 AUX SR R UR-3c
Rated heating capacity (kW) 1.05 1.8 3.0 3.5
Nozzle diameter (1/100 mm) 43 58 70 75
Pre-chamber (printed on nozzle) (H2) (M) (Y) (F4)
Reduced flow rate (W) 400 500 800 1600
Rated flow rate G30 (g/h) 76 131 218 255
Rated flow rate G31 (g/h) 75 129 214 250
11 Town gas G110 AUX SR R UR-3c
Rated heating capacity (kW) 1.05 1.8 3.0 3.4
Nozzle diameter (1/100 mm) 145 185 260 315
Pre-chamber (printed on nozzle) 8 2 3 13
Reduced flow rate (W) 400 500 800 1200
WARNING: In the case of conversion to Town Gas G110 – 8 mbar (category
1a), do not use the burners provided, but request the special G110 burners kit
from our Technical Assistance Service.
Loading ...
Loading ...
Loading ...