Loading ...
Loading ...
Loading ...
32
English
Installation
Preparation
Step 1.1 Choosing the installation
location
Overview of installation location requirements
CAUTION
CAUTION
• Comply with the length and height limits described in the
figure above.
Step 1.2 Checking and preparing
accessories and tools
Accessories
Accessories in the indoor unit package
Installation plate (1) Remote control (1)
User & Installation Manual (1)
Remote control battery (2)
Tools
General tools
• Vacuum pump
(Backward flowing
prevention)
• Manifold gauge
• Stud finder
• Torque wrench
• Pipe cutter
• Reamer
• Pipe bender
• Spirit level
• Screwdriver
• Spanner
• Drill
• L-wrench
• Measuring tape
Tools for test operation
• Thermometer
• Resistance meter
• Electroscope
100 mm or more
125 mm
or more
125 mm
or more
Drain hose hole
You can select the direction of
draining (left or right).
Loading ...
Loading ...
Loading ...