Loading ...
Loading ...
Loading ...
13
Installation Instructions
INSTALLATION – VENTED TO THE OUTSIDE
SECURE WIRING
• Route house wiring through the ceiling hole and
pull a length to reach the hood junction box.
• Tape the wire to the front of the frame support to
prevent damage during installation and service.
4
658Dia19
Ceiling
Support
Frames
Tape
House
Wiring
Front Side
SIZE AND INSTALL DUCTWORK
• Measure from house duct (Dim. A) to bottom of
support frame.
– Add at least 1″ for duct overlap at the top.
– Subtract 3/4″ for hood insertion into the bottom
of the frame.
• Cut the 6″ dia. duct to the required length.
NOTE: The bottom end of the duct must be flared
slightly, to facilitate installation of the hood.
• Install duct up through support frames onto the
house duct. Push duct up until it is 3/4″ from the
bottom of the support frame flange.
• Secure the duct to house duct connection with
screws and seal with duct tape.
• Seal duct connection with duct tape, making sure
connection is secured in place.
5
″
Loading ...
Loading ...
Loading ...