Monogram ZV855SPS 36" Stainless Steel Island Vent Hood S

User Manual - Page 13

For ZV855SPS.

PDF File Manual, 64 pages, Read Online | Download pdf file

ZV855SPS photo
Loading ...
Loading ...
Loading ...
13
Installation Instructions
INSTALLATION VENTED TO THE OUTSIDE
SECURE WIRING
Route house wiring through the ceiling hole and
pull a length to reach the hood junction box.
Tape the wire to the front of the frame support to
prevent damage during installation and service.
4
SIZE AND INSTALL DUCTWORK
Measure from house duct (Dim. A) to bottom of
support frame.
Add at least 1 for duct overlap at the top.
Subtract 3/4 for hood insertion into the bottom
of the frame.
Cut the 6 dia. duct to the required length.
NOTE: The bottom end of the duct must be flared
slightly, to facilitate installation of the hood.
Install duct up through support frames onto the
house duct. Push duct up until it is 3/4 from the
bottom of the support frame flange.
Secure the duct to house duct connection with
screws and seal with duct tape.
Seal duct connection with duct tape, making sure
connection is secured in place.
5
Loading ...
Loading ...
Loading ...