Monogram ZV855SPS 36" Stainless Steel Island Vent Hood S

User Manual - Page 12

For ZV855SPS.

PDF File Manual, 64 pages, Read Online | Download pdf file

ZV855SPS photo
Loading ...
Loading ...
Loading ...
12
Installation Instructions
INSTALLATION VENTED TO THE OUTSIDE
INSTALL UPPER SUPPORT FRAME
Secure the upper support frame to the ceiling
joists and/or cross framing with the 4 screws
provided. For maximum rigidity and strength, the
screws must be driven into the center of the joists
and/or cross-framing.
Check to be sure the support frame is level,
vertically and horizontally.
2
INSTALL LOWER SUPPORT FRAME
Insert lower support frame into the upper support
frame and loosely secure with 8 screws and
washers (4 on the front and 4 on the back sides).
Adjust the lower support frame up or down
to the desired height above the countertop.
Tighten screws.
IMPORTANT: Again, check to be sure the support is
level in both directions. There is no way to level the
hood after the hood is secured to the frame.
3
MOUNT TEMPLATE
Align the template with the marks on the ceiling and
tape in place.
Be sure the template is oriented correctly, with the
front of the hood.
Use a plumb to be sure the mounting holes will provide
parallel alignment with the countertop below.
Center punch all hole locations.
Drill pilot holes in the 4 screw
locations. Use a 5/32 bit and drill
approximately 1-1/2 deep.
Cut wire access hole
approximately 1 dia.
Cut the 6-1/2 duct opening
through the ceiling.
1
658Dia28
Wire Access Hole
Front of Hood
13-5/8
24 Minimum
30 Maximum
Loading ...
Loading ...
Loading ...