Loading ...
Loading ...
Loading ...
en Installation
14
5Installation
Instal l ati on
Preparing for installation
Caution!
Ensure that there are no electrical wires, gas pipes or
water pipes in the area where holes are to be drilled.
1. Determine where the extractor hood should be
positioned and lightly mark where the lower edge of
the appliance should be on the wall. Determine
where the middle should be based on the hob.
Note: We recommend fitting the extractor hood such
that the lower edge of the appliance is in line with
the lower edges of the adjacent wall-hung cabinets.
Make sure that the specified safety clearances from
the hob are complied with.
2. Place the template against the line drawn on the
wall. Mark where the screws should be inserted.
3. Drill three 8 mm diameter holes to a depth of 80 mm
for fastening the appliance and press in the wall
plugs flush with the wall.
Preparing the appliance
1. Remove the activated charcoal filter from the film.
2. Open the cover on the top of the appliance and
remove it ¨, insert the activated charcoal filter ©
and then close the cover.
[
PP
PP
PP
PP
$
Loading ...
Loading ...