Loading ...
Loading ...
Loading ...
49-2000707 Rev. 3 13
Installation Preparation
INSTALLATION PREPARATION
INSTALLATION DIMENSIONS
The hood duct covers can be adjusted for different
ceiling heights depending on the distance between
the bottom of the hood and the cooktop (distance
X). See Installation Height Table on the next page.
DUCT COVER REQUIREMENTS
Duct cover kits must be purchased separately.
We recommend that the vent hood and duct cover
(if used) be on site before final framing and wall
finishing. This will help to accurately locate studs,
ductwork and electrical service.
Duct cover accessory comes with a lower and
upper duct cover and installation hardware.
The installation hardware includes mounting
brackets to secure duct covers to the wall.
For vented installations, recirculation holes can be
hidden by installing the upper duct cover upside
down.
For ceiling installations up to 8' 4", use the 8'
Ceiling Duct Cover kit CX8DC9SPSS. This kit
only supports vented installation mode.
For ceiling installations up to 11’ 4", use the 10’
High Ceiling Duct Cover kit CX10DC9SPSS.
For higher ceiling installations up to 13’ 2", use the
12’ High Ceiling Duct Cover kit CX12DC9SPSS.
X = Distance from hood to cooktop. (Varies
depending on the installation) Required 24”
minimum over electric range or 30” minimum over
gas range. The recommended maximum is 36".
Typical Range
NOTE: 36" for typical electric range
and 38" for gas range.
Upper Duct
Cover
5" min
27" max
19-1/2”
18”
X
36”
or
38"
Lower Duct Cover
Required Min & Recommended Max Ceiling
Height Examples for 10’ Duct Cover Kit (Vented)
Electric Gas
X = 24”
Y = Min 8’ 2”
Max 9'10”
X = 30”
Y = Min 8’ 10”
Max 10’ 6”
X = 36”
Y = Min 9’ 4”
Max 11’ 0"
Y
Loading ...
Loading ...
Loading ...