Loading ...
Loading ...
Loading ...
Installation
*INSTALLATION*
59
Installation – flush-fit
Preparing the worktop
Create the worktop cut-out.
Remember to maintain the minimum
safety distances (see "Installation –
Safety distances").
Seal the cut surfaces of wooden
worktops with a suitable sealant to
avoid swelling caused by moisture.
The sealant must be heat-resistant.
Make sure the sealant does not
come into contact with the top
surface of the worktop.
For wooden worktops, secure the
wooden frames 5.5mm below the
upper edge of the worktop.
For CS7611FL, the wooden frame
must be secured 7mm under the
upper edge of the worktop.
Fitting the spacer bars
Use the middle screw holes if one of the
following SmartLine appliances is
installed to the right or left of the spacer
bar: CS7611, CS 7641, CS7101(-1),
CS7102(-1)
Wooden worktops
Position the spacer bars flush onto
the lower step of the stepped cut-out.
Secure the spacer bars with the
3.5x25mm wood screws supplied.
Granite and marble worktops
You will need heavy-duty double-
sided tape (not supplied) to secure the
spacer bars.
Stick the tape onto the lower step of
the stepped cut-out.
Position the spacer bars flush onto
the lower step of the stepped cut-out.
Press the spacer bars firmly into
place.
Loading ...
Loading ...
Loading ...