Capital PSVH30 Performance Series 30" Ventilation Hood

User Manual - Page 16

For PSVH30.

PDF File Manual, 28 pages, Read Online | Download pdf file

PSVH30 photo
Loading ...
Loading ...
Loading ...
15
VENT HOOD INSTALLATION (WITH SOFFIT)-CONT.
INSTALL VENT HOOD INTO SOFFIT:
At this point in the installation process, the blower motor should be removed from the hood assembly and set aside
(see-page 5). With the blower motor set aside, there is clear access to the soffit mounting holes and wall mounting
holes in the rear panel of the unit.
Once the soffit framing has been completed, place assembled Vent Hood (hood, rough-in kit, and ventilator) into place
and secure hood to the soffit frame with six wood screws.
NOTE: Additionally, we recommend the installer utilize the holes provided in the rear panel of the hood to secure the
hood to the rear wall and minimize any noise and vibration of unit.
NOTE: Assure that the mounting screws are long enough to be driven through the wood shims into the installed 2” x 4”s
for total support. (see fig. 5)
GO TO FINISHING THE INSTALLATION – Page 11
Loading ...
Loading ...
Loading ...