Loading ...
©2017 Hestan Commercial Corporation
2
CABINET INSTALLATION
(continued)
2. Consult the table at the end of this instruction manual to determine the appropriate cutout dimensions
for the Aspire Outdoor cabinet product you are installing. The cutouts should be square at all corners
for proper fitment of the cabinet. The installer will have to build up any internal structural elements or
supports in the island in order to secure the cabinet in place. Stainless steel hardware (not included) is
highly recommended.
3. Slide the frame into the opening and check for proper alignment. Secure the frame to the structural
members of your island using the various available mounting holes in the frame, and inside the cabinet
itself. Use at least 2 screws per side.
4. Reinstall the drawer(s) by aligning the slides on either side and pushing the drawer back into the opening.
You will hear the release levers click. Open and close the drawer a few times to check for proper function
and alignment. There are adjustment screws on either side of the drawer should vertical adjustment be
needed.
Loading ...
Loading ...
Loading ...