Loading ...
Loading ...
Loading ...
13INSTALLATION
ENGLISH
3 Assemble the charging station onto the top of
the floor stand pipe.
4 Connect the power adapter to the port on the
back of the charging station.
5 Drill a hole in the wall and insert the drywall
anchor b if needed.
Before drilling, make sure that there are no
pipes or electrical wires inside the wall at
the desired location.
For drywall anchor: use 1/4 (6.5 mm) drill
bit
For concrete or wall stud: use 1/8 (3 mm)
drill bit
If screwing into drywall, use the drywall
anchor.
6 Align the wall anchoring block c of the
chanrging station, and fix the charging station
to the wall by tightening the anchoring screw
d all the way.
7 Plug the power cord into the power outlet.
Using Double-Sided Tape to Secure the
Appliance
1 Use the double-sided tape a to attach the
wall anchoring block b to the charging
station.
Remove the center section of double-sided
tape before attaching it to the wall
anchoring block.
2 Attach the second piece of double-sided tape
to the other side of the wall anchoring block
to secure it to the wall.
Do not use double-sided tape on wallpaper.
Wall-Mounted Installation
For wall-mounted installations, the charging
station must be attached securely to the wall using
the provided (short) wall anchoring screws.
The detachable nozzle storage cannot be
attached to the charging station in a wall-
mounted installation.
us_main.book.book Page 13 Wednesday, May 13, 2020 4:20 PM
Loading ...
Loading ...
Loading ...