Loading ...
Loading ...
Loading ...
13INSTALLATION
ENGLISH
3 Assemble the charging station onto the top of
the floor stand pipe.
4 Connect the power adapter to the port on the
back of the charging station.
5 Drill a hole in the wall and insert the drywall
anchor b if needed.
• Before drilling, make sure that there are no
pipes or electrical wires inside the wall at
the desired location.
• For drywall anchor: use 1/4″ (6.5 mm) drill
bit
• For concrete or wall stud: use 1/8″ (3 mm)
drill bit
• If screwing into drywall, use the drywall
anchor.
6 Align the wall anchoring block c of the
chanrging station, and fix the charging station
to the wall by tightening the anchoring screw
d all the way.
7 Plug the power cord into the power outlet.
Using Double-Sided Tape to Secure the
Appliance
1 Use the double-sided tape a to attach the
wall anchoring block b to the charging
station.
• Remove the center section of double-sided
tape before attaching it to the wall
anchoring block.
2 Attach the second piece of double-sided tape
to the other side of the wall anchoring block
to secure it to the wall.
• Do not use double-sided tape on wallpaper.
Wall-Mounted Installation
For wall-mounted installations, the charging
station must be attached securely to the wall using
the provided (short) wall anchoring screws.
• The detachable nozzle storage cannot be
attached to the charging station in a wall-
mounted installation.
us_main.book.book Page 13 Wednesday, May 13, 2020 4:20 PM
Loading ...
Loading ...
Loading ...