Renogy RMS-PGH-US Monitoring Screen for PGH Inverter Series

User Manual - Page 10

For RMS-PGH-US.

PDF File Manual, 24 pages, Read Online | Download pdf file

RMS-PGH-US photo
Loading ...
Loading ...
Loading ...
09
BEFORE drilling, make sure there are no electrical component
or other obstacles that may interfere with installation on the
other side of the mounting surface.
Before installation, check to make sure the power is working
properly. Resolve any issues before installation of monitoring
screen and cable.
The following are recommendations for installation. There will
be multiple mounting methods depending on users’ applications.
The RMS-PGH requires a flush mount installation. The
RMS-PGH’s faceplate will be flush with the mounting surface
and the body of the meter.
CAUTION
WARNING
Please choose a clean, dry, protected and easily accessible
indoor location to install the monitoring screen. It is
recommended to mount the monitoring screen at eye level for
easy access to the battery information and operation buttons.
The RJ45/RJ12 Communication ports on the monitoring screen
are accessible from the back of the unit. Clearance of at least 2
inches (50 mm) behind the unit is recommended to allow for the
bending radius of the RJ45/RJ12 Communication Cables that
connect to the monitoring screen.
Before installing the monitoring screen, it is recommended to
have the following tools available:
Installation
Preparation
Choosing an Installation Location
Pencil Drill Jigsaw Phillips screwdriver
NOTE
Loading ...
Loading ...
Loading ...