Loading ...
Loading ...
Loading ...
94
OUTDOOR UNIT (ODU) INSTALLATION DETAILS FOR (3) FOAM SCREW PROTECTOR PADS
ENGLISH
Place (1) foam pad at the bottom of the unit between the casing and the coil in each of the fol-
lowing locations:
• Right side (toward front side of ODU) and securely in place to protect the heat exchanger coil
from the sharp screw points.
• Left side (toward front side of ODU) and securely in place to protect the heat exchanger coil
from the sharp screw points.
• Back side (center of ODU) and securely in place to protect the heat exchanger coil from the
sharp screw points. Note: take caution as screw locations are not easily visible.
Important:
The (3) pads must be securely in place to protect the heat exchanger coil from the sharp screw
points during a seismic event.
Use OSHPD Seismic Certification Preapproval (OSP)
• (1) OSP Label for ODU > OSP-0386-10 for LG Model No.: ARU*nnn*TE4
• (3) foam screw protector pads w/ adhesive backing
• This installation detail
Please do not discard this kit before following this instruction during the installation of the
ODU(s).
OUTDOOR UNIT (ODU) INSTALLATION DETAILS
FOR (3) FOAM SCREW PROTECTOR PADS.
Right Left Back