Loading ...
Loading ...
Loading ...
4. Squeeze sides of top weight cover together and lift up. Pull down on cable until it is tight. Install spiral pin
connecting cable assembly to top weight
QtyDescription
1Top weight cover1
1Spiral pin2
5. Verify the cable is moving smoothly.
6. Install back panel.
7. Install ten screws securing top covers (front and back) to frame using a Phillips screwdriver.
QtyDescription
810-32 screw1
2# 8 screw2
2Top cover3
1Back panel4
Securely anchor machine to floor
Owner should not allow equipment to be used until it is properly anchored as described below.
WARNING: Anchoring equipment:
To maximize stability and eliminate rocking, tipping, or falling over, equipment must be anchored to a
solid, level surface, utilizing all anchoring holes provided.
Fasteners must have a minimum of 500 lbs. tensile capacity. Cybex recommends .3/8” grade 2 bolts or
better. A minimum pull force of 220 lbs/100 kgs is required for each anchor position.
If leg frames do not contact surface, DO NOT pull down with anchors. Shim any leg or frame not in contact
with surface using flat washers.
Due to the wide variation of flooring on which machines may be anchored or installed, consult with a
qualified and licensed contractor to ensure proper anchoring and installation.
Verify proper operation
Page 16 of 24
Loading ...
Loading ...
Loading ...