GE - General Electric RAK4002D RAC Zoneline Direct Connect Junction Box (230 & 265V)

User Manual - Page 3

For RAK4002D.

PDF File Manual, 10 pages, Read Online | Download pdf file

RAK4002D photo
Loading ...
Loading ...
3
2F.
INSTALL JUNCTION BOX COVER
1. Carefully tuck all wires and connections back
inside the junction box. Be sure there are no
loose connections or stray uninsulated wires
exposed.
2. Align junction box cover ensuring mating tabs
base are inserted into slots on cover. Drive
screw securing cover in place.
3. Check to ensure all wires are inside junction box
and no wires are pinched between cover and
base.
4. Turn power back on to the installed unit and
check operation.
5. Replace the Zoneline front cabinet.
DIRECT ELECTRICAL CONNECTION
Installation Instructions
2D. INSTALL JUNCTION BOX
Install the junction box by inserting the left tabs
into control box cover slots, and aligning two screw
holes inside the upper and lower enclosure.
Tabs on
Junction
Box
Slots on
Control
Box Cover
Drive the two screws until they are secure.
Screws
Steel
2E. CONNECT THE POWER SUPPLY KIT
Plug the power connectors, ensuring plug is fully seated
and locking tabs are engaged.
15A 20A and 30A
For 20 AMP and 30 AMP power supply kits, a
second smaller plug must also be plugged into its
corresponding mating connector.
Loading ...
Loading ...
Loading ...