Loading ...
Loading ...
Loading ...
- 9 -
Installation procedure:
Remove the sticker from the front panel.1)
3)
Put the unit into the installation hole.2)
Fill up sews in the cabinet with sponge
or foam.
The installation place should be strong
enough to avoid the enlargement of
noise or vibration.
Installation assistance:
Use anti-corrosion metal support
The installation hole should be stro-
ng enough to support the air
conditioner. If it cannot, corrosion
resistant metal support has tobe
used outdoors. Iron support should
be fixed on the building (6hoZn at
right Iigure.)
Use of non-corrosive metal support
and capable of withstanding up to
three times the weight of the
product
it block the air inlet at the side grille.
Wall
Sunshade
board
Rubber
plate
Support
Horizontal line
Use sunshade board
Air conditioner should avoid anything
to be dropped into it and avoid direct
sunshine. If there is no cover on it,
you should contact the seller for inst-
alling the sunshade board. When in-
stalling the sunshade board, don’t let
condensation water can be drain
When installing the unit, it should slant
down to the back to make sure the
away conveniently.
(Slant about 3
(Shown at right figure.)
ed
1 )
+
-
+
-
3 1
Loading ...
Loading ...
Loading ...