Mitsubishi MUYGL24NA-U1 M-Series 22,500 BTU Single Zone Outdoor Cooling Unit MUYGL24NA

User Manual - Page 66

For MUYGL24NA-U1.

PDF File Manual, 76 pages, Download pdf file

Loading ...
Loading ...
Loading ...
OPERATING PROCEDURE PHOTOS/FIGURES
Photo 4 Photo 5
2. Removing the inverter assembly, inverter P.C. board
(1) Remove the cabinet and panels. (Refer to section 1.)
(2) Disconnect the lead wire to the reactor and the following
connectors:
<Inverter P.C. board>
CN721 (R.V. coil) (MUZ)
CN722 (Defrost heater and heater protector) (MUZ-
GL09/12/15NAH)
CN931, CN932 (Fan motor)
CN641 (Defrost thermistor (MUZ) and discharge tempera-
ture thermistor)
CN643 (Ambient temperature thermistor)
CN644 (Outdoor heat exchanger temperature thermistor)
CN724 (LEV)
(3) Remove the compressor connector (CN61).
(4) Remove the screws fixing the heat sink support and the
separator.
(5) Remove the fixing screws of the terminal block support and
the back panel.
(6) Remove the inverter assembly.
(7) Remove the screw of the ground wire and screw of the ter-
minal block support.
(8) Remove the heat sink support from the P.C. board support.
(9) Remove the screw of the inverter P.C. board and remove the
inverter P.C. board from the P.C. board support.
Photo 6
3. Removing R.V. coil
(1) Remove the cabinet and panels. (Refer to section 1.)
(2) Disconnect the following connectors:
<Inverter P.C. board>
CN721 (R.V. coil) (MUZ)
(3) Remove the R.V. coil.
Photo 7
66
Screws of the heat sink
support and the separator
Screws of the terminal block
support and the back panel
Screws of the
conduit cover
Screw of the
conduit plate
Heat sink
Screw of the
ground wire
Screw of the
Terminal block
support
Screw of the
inverter P.C. board
Heat sink support
P.C. board
support
Terminal
block
support
*U2 model does not
have a screw on the
heat sink support.
*
OBH733J
Loading ...
Loading ...
Loading ...