Mitsubishi MUYGL24NA-U1 M-Series 22,500 BTU Single Zone Outdoor Cooling Unit MUYGL24NA

User Manual - Page 49

For MUYGL24NA-U1.

PDF File Manual, 76 pages, Download pdf file

Loading ...
Loading ...
Loading ...
49
10-5. TROUBLESHOOTING FLOW
Are the voltages balanced?
Disconnect the connector between the compressor
and the power module (IC700) (MUZ-GL09/12/15/18,
MUY-GL09/12/15/18)/IGBT module (IC700) (MUZ-
GL24, MUY-GL24).
Replace the inverter P.C. board.
Check the voltage between terminals.
Check the compressor.
See 10-5. “Check of compressor”.
No
Yes
See 10-5. “Check of open phase”.
A How to check inverter/compressor
Refer to 10-5. “Check of compressor
operation time”.
Does the compressor operate continuously?
Refer to 10-5.
“Check of compressor start failure”.
OK
No
Yes
Refer to 10-5. “Check of compressor
winding”.
Is the compressor normal?
Replace the compressor.
No
Yes
B Check of open phase
C Check of compressor
● With the connector between the compressor and the power module (IC700) (MUZ-GL09/
12/15/
18, MUY-GL
09/12/15/
18)/IGBT
module (IC700) (MUZ-GL24, MUY-GL24) disconnected, activate the inverter and check if the inverter is normal by measuring
the voltage balance between the terminals.
Output voltage is 50 - 130 V. (The voltage may di󰀨er according to the tester.)
<< Operation method>>
Start cooling or heating operation by pressing EMERGENCY OPERATION switch on the indoor unit. (TEST RUN OPERA-
TION: Refer to 7-6.)
<<Measurement point>>
At 3 points
BLK (U)-WHT (V)
BLK (U)-RED (W)
WHT(V)-RED (W)
NOTE: 1. Output voltage varies according to power supply voltage.
2. Measure the voltage by analog type tester.
3. During this check, LED of the inverter P.C. board blinks 9 times. (Refer to 10-6.1.)
*Measure AC voltage between the lead wires at 3 points.
OBH733J
Loading ...
Loading ...
Loading ...