Loading ...
Loading ...
Loading ...
4
INSTALLATION REQUIREMENTS
Tools and Parts
Gather the required tools and parts before starting installation.
Tools needed for all installations:
Level
Tape measure Pliers
Flat-blade screwdriver #2 Phillips screwdriver
Adjustable wrench that
opens to 1" (25 mm) or
hex-head socket wrench
Tin snips (new vent
installations)
Caulking gun and
compound (new vent
installations)
1/4" (6 mm) and
5/16" (8 mm) nut driver
(recommended)
Leveling legs (4)
Tools needed for gas installations:
8" (203 mm) or 10"
(254 mm) pipe wrench
8" (203 mm) or 10"
(254 mm) adjustable wrench
(for gas connections)
Pipe-joint compound
resistant to propane gas
Utility knife
“Y” connector
Parts package is located in dryer drum. Check that all parts
are included.
NOTE: Do not use leveling legs supplied with dryer if installing
with a pedestal or a stack kit.
Parts supplied (all models):
Parts needed (steam models):
2' (0.6 m) inlet hose
5' (1.52 m) inlet hose
Parts needed (not supplied with dryer):
Vent clamps
Vent elbows and vent work
Rubber washer
Wire stripper
(direct wire installations)
Loading ...
Loading ...
Loading ...