- 12 -
CONNECT DECORATIVE FLUE
DUCTED INSTALLATION ONLY
Note: Rooms with 10 or 11 foot ceilings
require flue extension model AEIC34SB,
available from your local dealer. Discard
the upper flue supplied with the range
hood and replace it with the longer flue
extension.
1. Insert the upper flue and lower flue in the
support frame (Fig.11).
2. Attach upper flue temporarily to the support
frame with the mounting screws 3.9x9.5 mm,
slide the lower flue onto the support frame
and tape to hold in place (Fig.12).
3. Mount the hood to the ceiling using the (4)
previously installed 6x70mm screws.
Tighten these screws. Install (2) additional
6x70mm screws as shown in the
illustration. Make sure all (6) screws are
secure.
4. Secure the hood to the ceiling and install
the (2) additional screws (6x70mm).
5. Use 8" round metal duct to connect the
duct collar on the hood to the ductwork
above (Fig.13).
6. Use duct tape to make all joints secure and
air tight.
INSTALL THE HOOD
DUCTED AND NON-DUCTED INSTALLATION
1. Adjust the overall height of the support
frame. Loosen and re-tighten the 4 screws
in the height adjustment slots as
necessary. Insert 16 screws (3.9x9.5mm),
and 8 washers (D.6.4x12.5mm) located in
the Hardware Package (Fig.14).
FIG.11
FIG.12
FIG.13
8-INCH DIA.
METAL DUCT
INSTALL (16)
3.9 x 9.5 mm
SCREWS &
LOCK WASHERS
ON (8) SCREWS
FIG.14
MOUNTING
SCREWS
3.9 x 9.5 mm