Loading ...
Loading ...
Loading ...
38
EN
INSTALLATION
Cut out the work surface according to the sizes shown in the table and the drawing.
For the purpose of installation and use, a minimum of 50 mm space shall be preserved
around the hole. Be sure the thickness of the work surface is at least 30 mm. Please
select heat-resistant work surface material to avoid larger deformation caused by the
heat radiation from the hotplate.
Dimensions
(mm)
L W H D A B X
10030683
288 520 52 48 265+5 495+5 min. 50
10034193
590 520 56 52 555+5 495+5 min. 50
10034194
10036334
450 520 52 48 430+5 495+5 min. 50
Installation of the foam gasket
Do not install the hob without the foam gasket. The gasket should be tted to the hob as
follows:
Remove the protective lm from the gasket.
Then attach the gasket to the bottom of the glass next to the edge.
The gasket must be tted along the entire length of the edge of the glass and must
not overlap at the corners.
When tting the gasket, ensure that the glass does not come into contact with sharp
objects.
Gasket
Loading ...
Loading ...
Loading ...