GE 93105002 Lighting C by On/Off Button Style Works

User Manual - Page 18

For 93105002.

PDF File Manual, 25 pages, Read Online | Download pdf file

93105002 photo
Loading ...
Loading ...
Loading ...
STEP 7.A
Install The Switches
If installing a 4-way/Multi-Way setup: 4-Way Switch
1. Connect the GROUND wire from the wall to the green GROUND wire on the
C by GE Smart Switch.
2. Cap the red LOAD wire on the C by GE Smart Switch.
3. Connect the NEUTRAL wires that are associated with that circuit/switch group
from the wall to the white NEUTRAL wire on the C by GE Smart Switch.
IMPORTANT: If unsure which NEUTRAL wire is in which circuit/switch group,
contact C by GE customer support or a certified electrician.
4. Connect the two black TRAVELER wires to the black LINE wire on the
C by GE Smart Switch.
5. Cap the two red TRAVELER wires from the wall. These wires are not needed.
Loading ...
Loading ...
Loading ...