TOPCON OPUS B2+ Eco Full Codesys Display

Product's Documents

Below are documents related to this product, you can read online or download:
OPUS B2+ photo

User Manual

This is the main product document for model OPUS B2+.

The file format is pdf, 26 pages, you can download this manual here .

background
Page 1
OPUS B2/B2 Plus
Operating Manual
Hardware Description
background
Page 2
Versions
Example
OPUSB2EN1CANB000
OPUSB2 model
E E=ECO; S= Standard
N N=Normal size (4,3”); P=Plus size (7”)
1 1. Generation
CAN CAN=Projektor/C++
CDS=CODESYS
ISO=ISO-UT
B B=Basic; F= Full
000 customer specific identification
All product names cited in this operating manual are trademarks or registered
trademarks of the respective companies.
Operating Manual OPUS B2/B2 Plus
Order number: OPUSBA00B2
Topcon Electronics GmbH
Industriestraße 7, 65366 Geisenheim
+49 6722 / 6722 4026 - 888
Supplements or a special operator manual may be required for customer-
specific devices.
Version 22, April 2024
All rights reserved, including translation.
No part of this operating manual may be reproduced, in any form, (print,
photocopy, microfilm, or a different process), nor may it be processed,
duplicated, or distributed using electronic systems, without written permission
from Topcon Electronics GmbH, Geisenheim.
All content is subject to change without notice. All previous versions are
rendered obsolete with publication of this manual.
All information contained herein is subject to correction, manufacturer is not
liable for any errors in this material.
Errors and technical changes excepted.
background
Table of contents
Page 3
Table of contents
1 Preliminary Notes ............................................................................................... 5
1.1 Used Instruction Types ..........................................................................................................5
2 Safety instructions, guarantee and liability ..................................................... 6
2.1 Common ..................................................................................................................................6
2.2 Qualified Personnel ................................................................................................................6
2.3 Power Supply ..........................................................................................................................7
2.4 Interventions in the device ....................................................................................................7
2.5 Safety Instructions for the OPUS B2/B2 Plus ......................................................................8
3 Intended Use ..................................................................................................... 10
3.1 Example of Use .................................................................................................................... 11
3.2 Device Description .............................................................................................................. 12
3.2.1 OPUS B2/B2 Plus ............................................................................................................. 12
3.3 Features Overview for OPUS B2/B2 Plus ......................................................................... 14
3.4 Application Development ................................................................................................... 14
3.5 Development Kit .................................................................................................................. 15
4 Getting Started ................................................................................................. 17
4.1 Check the delivered parts ................................................................................................... 17
5 Electrical installation OPUS B2/B2 Plus ......................................................... 17
5.1 Unused plugs ....................................................................................................................... 18
5.2 First steps ............................................................................................................................ 18
5.3 Cleaning / service / maintenance ....................................................................................... 19
6 Technical Documentation ................................................................................ 20
6.1 Dimension Drawings – OPUS B2/B2 Plus ......................................................................... 20
6.2 Specification OPUS B2 ....................................................................................................... 24
6.3 Specification OPUS B2 Plus ............................................................................................... 24
6.4 Declaration of Conformity .................................................................................................. 25
6.4.1 Declaration of Conformity for OPUS B2 ........................................................................ 25
background
Page 4
6.4.2 Declaration of Conformity for OPUS B2 Plus ............................................................... 26
background
Safety instructions, guarantee and liability
Page 5
1 Preliminary Notes
This document is valid for the following OPUS B2/B2 Plus version:
OPUSB2 Eco
OPUSB2 Standard
OPUSB2 Plus Eco
OPUSB2 Plus Standard
This document is directed to the qualified personnel and contains all the important
information to the correct use of the OPUS B2/B2 Plus.
Please read this document before the first use and keep it during the operation.
To provide a better overview, this operating manual cannot present all details for
handling the OPUS B2/B2 Plus in all conceivable application cases. Neither can all
conceivable methods of setting up the device, operating the device, and servicing the
device be discussed in this manual. In case more information or support is required
please contact manufacturer technical support department.
1.1 Used Instruction Types
This operating manual contains instructions that must be complied with for your
personal safety and to avoid damage to property.
The instructions are presented as follows listed by degree of hazard:
Hazard!
Very Important information
Malfunction or Failure possible if non-compliance
Caution!
Severe bodily injury or property damage can occur if the
respective precautionary measures are not taken.
Note
Additional information about the product, the handling of the
product or the respective part of the operating manual to which
particular attention should be paid.
background
Safety instructions, guarantee and liability
Page 6
2 Safety instructions, guarantee and liability
2.1 Common
Read this operating manual before commissioning the OPUS B2/B2 Plus. Keep this
operating manual where it is accessible to all users at any time. Every person who is
assigned to commission or operate the OPUS B2/B2 Plus must have read and
understood the operating manual and the safety instructions in particular!
This operating manual contains instructions that must be complied with for your
personal safety and to avoid damage to property. Failure to follow these safety
instructions could result in fire, electric shock, or other injury or damage to OPUS B2/B2
Plus or other property.
2.2 Qualified Personnel
This operating manual is intended for technically qualified personnel, who have the
appropriate skills in measurement, control, and regulating technology.
Precise knowledge of all safety instructions and warnings contained in this operating
manual, as well as problem-free technical implementation of these instructions and
warnings are the prerequisites for hazard-free installation, commissioning, safe
operation, and maintenance, of the operator panel. Consequently, it is strictly required
that all measures be performed by qualified personnel.
Qualified personnel, in accordance with the safety and warning instructions contained
in this operating manual are personnel, who
are familiar with CAN bus systems, related protocols and network designs that
fulfill all legal requirements of the intended application, so that they are able to
program the OPUS operator panel accordingly
have gained knowledge of the programming related concepts by education or
trainings. Using the Projektor Tool a Projektor Tool training by Topcon needs to
be attended. Using CODESYS a CODESYS training needs to be attended,
either held by Topcon or 3S.
are familiar with the safety concepts of automation technology, either as project
design personnel
or operating personnel who have been instructed in how to handle the
automation technology, and who are familiar with the section of this manual
which deals with operation.
or who, as commissioning, and service personnel have been trained to repair
this type of automation technology, or who are authorized to commission,
ground, and label electrical circuits and devices, or systems, in accordance with
technical safety standards.
All persons who are involved in project planning, installation and operating the OPUS
B2/B2 Plus must be familiar with automation technology safety concepts, and they
must be qualified in accordance with the guidelines listed above.
background
Safety instructions, guarantee and liability
Page 7
Serious bodily injury and property damage can occur in the event of unqualified
interventions in the device, or the system, or failure to heed the warning instructions
specified in this operating manual.
Consequently, only personnel who are appropriately qualified may undertake
interventions on this device, or on the associated system.
2.3 Power Supply
OPUS B2/B2 Plus is designed for 12V- and 24V-Systems. The operating voltage range
is 9-36 VDC, overvoltage resistance 48V for 5 minutes, inverse-polarity protection up
to -48 VDC for 5 minutes.
2.4 Interventions in the device
The OPUS B2/B2 Plus has been developed, manufactured, and tested in compliance
with applicable standards. When the handling guidelines and safety-related
instructions described here are complied with for project design, mounting, intended
use, and maintenance, normally the product poses no hazards relative to property
damage or to personal health. Nevertheless, the device can cause residual hazards if
it is used or operated improperly by personnel who have not been trained.
In case of malfunctions or lacks please get in contact with the manufacturer. Any
interventions in the device can cause serious interferences of the security for people
and machines. They are not allowed and lead to disclaimer of liability and guarantee
exclusion.
TOPCON is not liable for damage that occurs due to improper
misuse of the delivered components, or through failure to heed
the instructions in the operating manual, including the safety
instructions.
TOPCON is not liable for damage that occurs due to unintended
or intended changes of the TOPCON board support package or
any other parts of the operating system.
TOPCON is not liable for damage that occurs due to
improper programming and/or testing of the created
application that runs on the OPUS operator panels.
TOPCON is not liable for damage or malfunctions occurs using
pirated or illegal software on the OPUS operator panel.
background
Safety instructions, guarantee and liability
Page 8
Moreover, we expressly declare that all obligations on the part of Topcon are
exclusively derived from the respective purchase contract, in which the guarantee is
conclusively stipulated.
2.5 Safety Instructions for the OPUS B2/B2 Plus
Dangerous high voltage
Never attempt to repair or modify OPUS B2/B2 Plus yourself.
Disassembling OPUS B2/B2 Plus may cause damage that is not
covered under the warranty and cause hazardous conditions by
the high-voltage components inside of the unit.
OPUS B2/B2 Plus does not contain any user-serviceable parts.
Service should only be provided by Topcon Electronics GmbH.
Hazardous situations due to device failure
Do not use the OPUS B2/B2 Plus as the sole means of preventing
hazardous conditions on vehicles, machines and equipment.
Vehicles, machines and equipment must be constructed in such
a manner that defective conditions associated with the OPUS
B2/B2 Plus cannot cause a hazardous situation for operating
personnel.
Ensure that incorrect inputs via the OPUS B2/B2 Plus, its
malfunction, or its failure cannot lead to major property damage,
or to a hazard for operating personnel.
Missing safety devices if used improperly
Precautions for the safety of a system should not be rendered
inoperable through the use of the OPUS B2/B2 Plus.
Emergency-Stop devices must remain effective in all operating
modes.
Unintentional operation
Operating states can be called due to unintentional operation of
the OPUS B2/B2 Plus that are not appropriate for the situation.
OPUS B2/B2 Plus devices should be installed in such a manner
that the possibility of unintentional operation is adequately
excluded.
TOPCON is not liable for injuries to third party licenses for the
contents used on OPUS panel by the end customer.
background
Safety instructions, guarantee and liability
Page 9
If a further usage of the OPUS B2/B2 Plus will cause danger, the
device and if necessary the system needs to be switched off and
be secured against unintented activation. This particularly
applies:
If the device shows visible signs of damage
If the device is no longer functional
If parts of the device are disconnected or loose
if the connection lines show visible damage
Undefined operating states
Undefined operating states can cause personal injury or property
damage.
To prevent supply line and signal line interruptions from causing
undefined or hazardous operating conditions, appropriate
hardware and software safety precautions must be maintained.
Supply lines and signal lines must be installed in such a manner
that noise (such as inductive or capacitive interference) cannot
impair OPUS B2/B2 Plus function.
Using Connectors and Ports:
Never force a connector into a port. Check for mechanical
obstructions on the port. If the connector and port don’t join with
reasonable ease, they probably do not match. Make sure that the
connector matches the port and that you have positioned the
connector correctly in relation to the port.
background
Technical Documentation
Seite 10 von 31
3 Intended Use
The operator panel OPUS B2/B2 Plus is a programmable graphical display used to
operate and monitor vehicles and working machines.
The communication with other system components, as for example decentralised I/O
module, occurs over the CAN interfaces with the supported protocols: CANopen,
J1939 and CANFreestyle (layer II).
For service purposes additional interface like USB is available. Together with
Embedded Linux operating system it forms a universal platform for the communication
with other CAN devices, networks or PCs.
The operator panel OPUS B2/B2 Plus is not admitted for security-
relevant duties for personal protection purposes.
background
Technical Documentation
Page 11
3.1 Example of Use
Control Unit 1
Controlling of the
actuation
Control Unit 2
Data logging
Control Unit 3
Controlling of
movement
Sensor 1
Sensor for
CAN-Bus
background
Technical Documentation
Page 12
3.2 Device Description
3.2.1 OPUS B2/B2 Plus
Fig. 3.1: Schematic diagram of the OPUS B2/B2 Plus
Display:
B2: 4.3” (480x272 px) TFT color graphic LCD display
B2 Plus: 7” (800 x 480 px) TFT color graphic LCD display
Fig. 3.4: Schematic diagram of OPUS B2/B2 Plus backside
Main connector
Service interface
(For service only)
USB-C slot
Display
Keys
Gore-membrane
Buzzer opening
Mounting (RAM)
background
Technical Documentation
Page 13
Service interface:
On OPUS B2/B2 Plus there is a service interface available. This interface serves
Topcon internal service use only.
Please do not remove the protection cap of service interface!
OPUS B2/B2 Plus may only be used with factory closed protection cap otherwise
Topcon Electronics GmbH is no liable for any damage or misfunction.
Power-on/off behavior:
OPUS B2/B2 Plus can be switch on/off by the power supply directly.
As soon as the device is supplied with the necessary voltage via terminal 30 (battery
plus), terminal 31 (battery GND) and terminal 15 (ignition), it will start to boot. In order
to decrease boot time, the device supports power modes with which you can put the
device in a sleep mode before it powers down.
When ignition voltage is removed, the device will switch to low-power-mode (see
C/C++ Developer Guide). After a time, frame that can be configured (default time is
60 sec) the device will move one more step down to sleep-mode. After another 60
seconds (default time) the unit will fully switch off. As soon as terminal 15 is switched
on again the unit will go back to on-mode in full operation.
Power Mode current at 12 V DC
On (without USB use)
B2: < 165mA @ 12V (< 2 W)
B2 Plus: <370mA@12V (<5W)
Low-power ~ 40mA @ 12V (< 0,5 W)
Sleep ~ 30mA @ 12V (< 0,35 W)
Off
~ 0,08mA @ 12V (< 1 mW)
For more information, please refer to the C/C++ Developer Guide.
USB slot:
OPUS B2/B2 Plus offers USB 2.0 with C slot be used for software update and data
transfer.
Main connector:
The following interfaces are available:
Power supply and ignition input
2 x CAN-Interfaces according to ISO/DIS 11898
Service enable
Do not unplug clamp 30 from power supply on running unit.
Power supply interruption on clamp 30 may cause data
corruption and loss.
background
Technical Documentation
Page 14
3.3 Features Overview for OPUS B2/B2 Plus
Encapsulated plastic housing to be mounted in landscape or portrait mode,
standalone or in dash
4.3” & 7” TFT color display for automotive with resolution 480x272 / 800 x 480
pixels
Capacitive touch screen Buzzer (only Full option)
Freescale NXP i.MX 6 ULL MCIMX6Y2CVM05AB
32bit processor with embedded Linux operating system (Linux kernel 6.x)
Two CAN interface (ISO 11898) using CANopen® and SAE J1939 protocols.
Layer II is supported
Capacitive touch screen(only Full option)
USB 2.0 with C slot on Backside
The OPUS B2/B2 Plus is particularly characterized by its robust construction, and it
has been developed especially for harsh use conditions in mobile work machines.
3.4 Application Development
There are three possible ways to program the OPUS B2/B2 Plus and make it an
integrated part of its application.
1. OPUS Projektor:
This powerful development environment provided by Topcon Electronics GmbH
enables the quick and effective creation of an application for the OPUS B2/B2 Plus
operator terminal. Use the Projektor to conveniently design the user interface on the
computer, which can be easily displayed on the device. Additionally, this tool includes
features to work with CANopen
®
, J1939 and CANFreestyle protocols for CAN
communication.
For further information please refer to the OPUS Projektor Online Manual.
With ISO devices, the OPUS B2/B2 Plus can be used as an ISO-VT slave in
accordance with the ISO-11783 standard. The necessary configuration is also done in
the OPUS Projektor.
2. CODESYS 3.x:
CODESYS is a programming tool and system developed by the German company 3S
Systems GmbH according to IEC 61131-3 standard. It supports different means of
programming such as FUP or Structured Text. It can be used to program the OPUS
B2/B2 Plus and CODESYS compatible ECUs. CODESYS includes the functionality to
configure the CANopen
®
, J1939 and CAN Layer 2protocol for communication over
CAN bus.
For further information please refer to the Codesys Help File.
3. C-Programming:
OPUS B2/B2 Plus with its embedded Linux operating system can be fully programmed
using C or C++ as programming language.
For further information and function-call list please refer to the C/C++ Developer
Guide.
background
Technical Documentation
Page 15
Please take notice of the following recommendation and prerequisites for the computer
used to the application design and /or programming:
- Using Projektor Tool and CODESYS for the development, it is recommended to
use the PC with Windows 10 or 11 operational system, at least 5 GB free hard
disk capacity and 8 GB RAM.
- Programming with C/C++, Linux operational system is prerequisite.
3.5 Development Kit
For programming the graphical user interface of the OPUS B2/B2 Plus some different
development kits are provided.
Topcon Toolchain with Projektor Tool
Order number: OPEPB2CAN
Description Order Number Qty
Main connecting cable OPKAB2CAN15 1
Service-Adapter OPUS B2 OPUSB2XZSA000 1
USB coupler, cable 0.15m, type A
female
OPKAB2USBA015 1
SUB-D9 female/male connector,
with CAN terminating resistor
1
LogiLink UA0025C USB 2.0 (male)
to Fast Ethernet Adapter (RJ45
female)
1
D-SUB9-male to USB A-male, 1m,
Conrad 1360254
-
VQ
1
WE Toolchain download:
- Projektor Tool
- PClient
-
Documentation
1
Basic Projektor-Tool training at a
Topcon facility
1
Projektor Tool license
2
12 months technical support
1
The operator panel OPUS B2/B2 Plus generation may only be
handled due to the according operation manual.
background
Technical Documentation
Page 16
CODESYS 3.x
Order number: OPEPB2CDS
Description Order Number Qty
Main connecting cable OPKAB2CAN15 1
Service-Adapter OPUS B2 OPUSB2XZSA000 1
USB coupler, cable 0.15m, type A
female
OPKAB2USBA015 1
SUB-D9 female/male connector,
with CAN terminating resistor
1
LogiLink UA0025C USB 2.0 (male)
to Fast Ethernet Adapter (RJ45
female)
1
D-SUB9-male to USB A-male, 1m,
Conrad 1360254
-
VQ
1
CODESYS Software download:
- Development Tool
- Application
- Target files
-
Documentation
1
Basic CODESYS training at a
Topcon facility
1
12 months technical support
1
background
Technical Documentation
Page 17
4 Getting Started
4.1 Check the delivered parts
Please check whether all parts described in the scope of delivery have been delivered
correctly. For question or reclamation please contact the support team of Topcon
Electronics GmbH (opus-support@topcon.com).
5 Electrical installation OPUS B2/B2 Plus
Below you find the pin out diagram of the OPUS B2/B2 Plus. The connectors (see fig.
3.3) are drawn as seen from the back side of the unit.
Please be aware that the existing pins and connectors depend on the hardware option
you ordered.
Please note that the OPUS B2/B2 Plus only represents one part of the entire CAN
network. Set-up and dimensioning of the network must be executed by specialized
personnel, and the information in this regard cannot be a component of this operating
manual.
Main connector pinout (in full option)
pin no. assignment description
1
SERV_EN
Service Enable
2
KL15
ignition input; terminal 15
3 KL31 supply voltage -; terminal 31
4 KL30 supply voltage +; terminal 30
5 CAN 2 L CAN 2 low
6 CAN 2 H CAN 2 high
7
CAN 1 L
CAN 1 low
8
CAN 1 H
CAN 1 high
Please observe the following guidelines for set-up:
Main Connector
(Deutsch DT06-08SA)
background
Technical Documentation
Page 18
Power supply lines should only be passed in pairs as close together as possible.
Sensitive signal lines should be shielded to achieve highest possible damping,
and under this shielding they should be still passed twisted.
Metal plug connections should be used for shielded lines.
Cable bundles should be distributed in accordance with their purpose (e.g. HF,
LG, and power supply); the groups thus formed should not be routed in parallel
to the extent possible, and they should be routed with clearance.
The OPUS B2/B2 Plus relies on a connection to an ECU that controls the functions
and features of the target vehicle/machine.
Please keep all the connectors separated. All connection should be done on the
shortest distance to the unit.
5.1 Unused plugs
ACH
TUN
5.2 First steps
Plug in the main connector into the OPUS B2/B2 Plus. Then connect the clamps 15
and 30 for the plus voltage, as well as clamps for GND for the ground. Switch on the
Power supply.
On start the boot-logo image will be displayed on the screen. This may be exchanged
with the customer specific image (please refer to C/C++ Developer Guide for more
information).
The boot up takes about 8 seconds and will then call the application according to the
start scripts on the unit (start scripts for Projektor Tool or CODESYS application
already installed by delivery).
Penetrating humidity by unused and unprotected plugs may
cause damage of the unit. Please protect unused plugs with the
special blind inserts that have been supplied with the units.
The ECU must be the component in charge of all safety related
functions.
Wrong connection may cause damage of the unit.
background
Technical Documentation
Page 19
The application displays the information of the application software version.
CODESYS application also contains a simple function test. Each newly downloaded
application will replace the old one automatically.
5.3 Cleaning / service / maintenance
Cleaning agents which have an abrasive or dissolving effect on the glass pane touch
screen or the housing should not be used to clean OPUS B2/B2 Plus operator panels.
Only use soft clothes with a little soap and water or mild dish washing liquid.
The OPUS B2/B2 Plus does not have any parts that require service by the user.
Repairs can only be performed by Topcon Electronics GmbH.
background
Technical Documentation
Page 20
6 Technical Documentation
6.1 Dimension Drawings – OPUS B2/B2 Plus
OPUS B2 Eco
background
Technical Documentation
Page 21
OPUS B2 Standard
background
Technical Documentation
Page 22
OPUS B2 Plus Eco
background
Technical Documentation
Page 23
OPUS B2 Plus Standard
background
Technical Documentation
Page 24
6.2 Specification OPUS B2
OPUS B2 ECO OPUS B2 Standard
Basic Full Basic Full
Dashboard
Mount
X X X X
Dimensions
approx. (mm)
123x89x35mm 123x89x35mm 144x89x35 mm 144x89x35 mm
Display size
480 x 272
pixels
480 x 272
pixels
480 x 272
pixels
480 x 272
pixels
Touchscreen
X X
Buzzer
X X
Processor
Speed
528MHz 528MHz 528MHz 528MHz
RAM
256 MB DDR3 256 MB DDR3 256 MB DDR3 256 MB DDR3
Mass Storage
2 GB 2 GB 2 GB 2 GB
EEPROM
64Kbit 64Kbit 64Kbit 64Kbit
CAN bus
2 2 2 2
USB-C
1 1 1 1
6.3 Specification OPUS B2 Plus
OPUS B2 ECO OPUS B2 Standard
Basic Full Basic Full
Dashboard
Mount
X X X X
Dimensions
approx.(mm)
188x129x37,5
mm
188x129x37,5
mm
211x129x37,5
mm
211x129x37,5
mm
Display size
800 x 480
pixels
800 x 480
pixels
800 x 480
pixels
800 x 480
pixels
Touchscreen
X X
Buzzer
X X
Processor
Speed
528MHz 528MHz 528MHz 528MHz
RAM
256 MB DDR3 256 MB DDR3 256 MB DDR3 256 MB DDR3
Mass Storage
2 GB 2 GB 2 GB 2 GB
EEPROM
64Kbit 64Kbit 64Kbit 64Kbit
CAN bus
2 2 2 2
USB-C
1 1 1 1
background
Technical Documentation
Page 25
6.4 Declaration of Conformity
6.4.1 Declaration of Conformity for OPUS B2
background
Technical Documentation
Page 26
6.4.2 Declaration of Conformity for OPUS B2 Plus

Specifications

TOPCON OPUS B2+ Questions and Answers

Questions and Answers

Related Products