Loading ...
Loading ...
Loading ...
Step 4 - Connect the wire open of branch end to the junction box.
- �� -
Step 5 - Connect Microinverter to the PV Modules
NOTE:When plugging in the DC cables, if AC already available,the Microinverter should
immediately blink red light and will start work within the setting time (default �� seconds).
If AC is not available,the red light will blink � times quickly and repeat after one second
until AC is connected.
General Guidelines:
a. PV modules should be connected to DC input ports of a
Microinverter.
b. In order to meet the relevant regulatory requirements, the cable length must be <�M.
Please consult the local power operator to make sure that the DC cable complies with local
regulations.
Microinverter System Operating Instructions
�. Turn ON the AC circuit breaker on each Micro Inverter AC branch circuit.
�. Turn ON the main utility-grid AC circuit breaker. Your system will start producing
power after a one-minute waiting time.
To operate the Microinverter PV system:
Junction Box
Loading ...
Loading ...
Loading ...