Hikvision DS-3E2528 28 Port Gigabit Full Managed Switch

Installation Guide - Page 12

For DS-3E2528.

PDF File Manual, 26 pages, Read Online | Download pdf file

DS-3E2528 photo
Loading ...
Loading ...
Loading ...
- 7 -
When you install the machine box at the open cabinet, prevent the frame of
the cabinet from blocking the airway of the machine box.
Ensure that nice ventilation is provided for the devices installed at the bottom
of the cabinet.
The clapboard separates exhaust gas and inflow air, and boost cool air to
flow in the machine box. The best location of the clapboard is decided by the
air flow mode in the machine box, which can be obtained through different
location tests.
2.3.4 Power Requirements
Make sure that the power supply has nice grounding and the power at the input
side of the switch is reliable. The voltage control can be installed if necessary. At
least a 240 V, 10A fuse or a breaker is provided in the phase line if you prepare the
short-circuit prevention measures for a building.
Caution:
If the power supply system does not have good grounding, or the input power
disturbs too much and excessive pulses exist, the error code rate of
communication devices increases and even the hardware system will be
damaged.
2.4 Installation Tools and Device
The tools and devices to install the 24 SWITCH are not provided by the 24
SWITCH switch. You yourself need to prepare them. The following are the tools
and devices needed for the typical installation of the 24 SWITCH switch:
Screwdriver
Static armguard
Bolt
Ethernet cable
Other Ethernet terminal devices
Control terminal
Loading ...
Loading ...
Loading ...