Loading ...
Loading ...
Loading ...
Figure 2-38 Cave the Installaon Hole
2.
Select a cable entry and remove the plasc sheet.
3.
Mark the gang box screw holes on the wall.
1) Route the cables through the gang box hole.
2) Insert the gang box into the installaon hole.
3) Mark the gang box screw holes'
posion with a marker, and take out the
gang box.
Figure 2-39 Mark the Screw Holes
4.
Drill 4 holes according to marks on the wall, and insert the expansion sleeves
into the screw holes. The suggested size of hole is 6 (diameter) × 45 (depth) mm.
5.
Fix the gang box with 4 expansion bolts.
Module Door
Staon User Manual
36
Loading ...
Loading ...
Loading ...