Jenn-Air 1890304 3 Piece RISE Series Smart Kitchen Appliances Package with JBSS48E22L 48" Side-by-Side Refrigerator, JES1450ML 30" Downdraft Electric Range and JDPSS246LL 24" Dishwasher

User Manual - Page 24

For 1890304.

PDF File Manual, 48 pages, Read Online | Download pdf file

1890304 photo
Loading ...
Loading ...
Loading ...
24
COMPLETE INSTALLATION
1. Turn the water supply line valve to the “Open”
position.
2. Turn the refrigerator switch to the ON position. See
“Power On/Off Switch” in the Use & Care Guide for
instructions. Wait a few minutes. Check the water line
connections for leaks.
3. Remove all boxes, parts packages and packing
materials from the interior of the refrigerator. See
the “Cleaning” section in the Use & Care Guide for
instructions. Remove the film and cardboard from
the grille and doors or door frame, depending on
your model.
4. Install the shelves and bins in the refrigerator and
freezer compartments.
5. The controls are preset at the factory to the midpoint
setting. Make sure the compressor is operating
properly and that all the lights are working.
6. Flush the water system before use. See “Water
System Preparation.
To get the most efficient use from your new built-in
refrigerator, read the Use & Care Guide. Keep Installation
Instructions and Use & Care Guide near the built-in
refrigerator for easy reference.
WATER SYSTEM PREPARATION
Please read before using the water system.
IMPORTANT: After connecting the refrigerator to a water
source or replacing the water filter, follow the steps below
to make sure that the water system is properly cleaned.
This will flush air from the filter and water dispensing
system, and prepare the water filter for use.
Do not use with water that is microbiologically unsafe or
of unknown quality without adequate disinfection before
or after the system. Systems certified for cyst reduction
may be used on disinfected waters that may contain
filterable cysts.
NOTE: If your model has a base grille filter system, make
sure the base grille filter is properly installed and the cap
is in the horizontal position.
1. Open the freezer door and turn off the ice maker. The
On/Off switch is located on the top right side of the
freezer compartment. Move the switch to the OFF
(right) setting as shown.
2. Use a sturdy container to depress and hold the
water dispenser lever for 5 seconds, then release
it for 5 seconds. Repeat until water begins to flow.
Once water begins to flow, continue depressing
and releasing the dispenser lever (5 seconds on,
5 seconds off) until a total of 3 gal. (12 L) has been
dispensed. This will flush air from the filter and water
dispensing system, and prepare the water filter for
use. Additional flushing may be required in some
households.
NOTE: As air is cleared from the system, water may
spurt out of the dispenser.
3. Open the freezer door and turn on the ice maker.
Move the switch to the ON (left) position.
NOTES:
Allow 24 hours to produce the first batch of ice.
Discard the first three batches of ice produced.
Allow 3 days to completely fill ice container.
Depending on your model, you may want to
select the maximum ice feature to increase the
production of ice.
Loading ...
Loading ...
Loading ...