Loading ...
Loading ...
Loading ...
Installation Instructions
English26
About Oven Functions
Before sliding the range into the cabinet
Regulator connection
Gas line
1. Turn off the gas-supply valve, and turn off power to
the range.
2. Connect a exible gas line to the shut-off valve
installed on the stub out. The line must be long
enough that the range can be pulled out for service
without disconnecting the line.
3. Slide the gas line up through the chassis' access holes
to the regulator. (Move the wires inside the access
holes to keep them from catching on the gas line.)
4. Connect the gas line to the regulator.
5. Turn off all cooktop controls, then turn on the gas
supply.
6. With a soap-and-water solution, check all lines and
connections for leaks.
7. Turn off the gas-supply valve.
Final Installation
Leveling leg
1. Make sure the range is positioned where you want it.
2. Using a wrench, level the range by turning the front
leveling legs in or out as necessary. Counterclockwise
shortens the leg and lowers the range. Clockwise
lengthens the leg and raises the range.
NOTE
Adjusting the two front legs is usually sufcient, but adjust
all four legs if necessary.
Adjust the leveling legs only as far as necessary to level
the range. Extending the leveling legs more than necessary
or removing legs can cause the range to be unstable.
3. If range is next to or between cabinets, make sure the
cooktop (without the surface burner grates) is level with
the countertops.
4. Position an oven rack in the center rack position.
5. Check the level of the range with a carpenter level using
the two positions shown at right.
6. After the range becomes level, slide the range away from
the wall so that the anti-tip bracket can be installed.
7. After installing and leveling the range, install front
leg covers (right and left).
INSTALL_DOP36C86DLS_DA_DG68-01510A.indb 26INSTALL_DOP36C86DLS_DA_DG68-01510A.indb 26 2023-02-23 오전 9:57:502023-02-23 오전 9:57:50
Loading ...
Loading ...
Loading ...