Loading ...
Loading ...
Loading ...
![](https://files.manualsfile.com/22283163-ds-k3g200lx/bgf.png)
Steps
Note
•
The device should be installed on the concrete surface or other
non-ammable surfaces.
•
To prevent stainless steel from rusng due to dirt during
construcon, it is recommended that the protecve lm be
removed
aer the installaon is completed. There may be
residual adhesive at the lm cung posion. It is
recommended to use WD-40 protecve liquid to wipe aer
tearing the lm.
•
The dimension is as follows.
Figure 3-2 Dimension
1.
Prepare for the installaon tools, check the components, and
prepare for the installaon base.
2.
Seal the boom of the turnsle to avoid water from entering.
3.
According to the entrance and exit marks on the pedestals,
move the pedestals to the corresponded posions.
Note
Make sure the installaon holes on the pedestals and the base
are aligned with each other.
4.
Secure the pedestals with expansion bolts.
Note
•
Do not immerse the pedestal in the water. In special
circumstances, the immersed height should be no more than
150 mm.
5.
Install the barrier arm.
4 General Wiring
Note
•
Aer maintenance, you should close the water-proof cover
over the high voltage module.
•
When you should maintain or disassemble the high voltage
modules, you should remove the enre high voltage modules
and maintain it outside the
turnsle. You should unplug the
cables that connected to the peripherals before maintenance
to avoid destroy of the device.
4.1 Components Introducon
3
Loading ...
Loading ...
Loading ...