Multifunction PV Analyzer
Te s t S e tu p
17
Continuity of Protective Earthing and Equipotential Bonding Conductors
For accurate measurements, always compensate the resistance of the test leads before you
make measurements:
1. Turn on the PV Analyzer.
2. Turn the rotary switch to
.
3. Zero (short) the green lead and yellow lead.
4. Push
.
For more information, see Figure 1.
5. Follow the on-screen prompts.
6. To assign Pass or Failed status, set the regulatory limits for the measurements.
Note
You cannot change the limits after the measurement is taken. If you change the limit,
you must repeat the measurement.
Set Limits
The regulatory limit is based on the length of the cable used in the test.
To s et :
1. Turn on the PV Analyzer.
2. Turn the rotary switch to
.
3. Use
or to highlight an option.
4. Push
to edit the option.
The Manual Entry screen shows on the display.
5. Push
to open the Adjustment menu.
6. Use
to change the value.
7. Adjust the Cross Section and Material options as required.
8. Push
to toggle between the Manual Entry screen and Auto Calculate limit.
9. Push
to save the calculation and return to the Measurement screen.