Equipotential
bonding
Connection with male thread
3/8“ x 1 3/8“
10 mm × 35 mm
Connection with washers and nut
3/8“
M 10
Accessories to be ordered separately.
If necessary, equipotential bonding with good galvanic contact must be provided in accordance with
all appropriate national and local regulations.
Steam
connection
Steam pressure
87 - 145 psi
600 - 1.000 kPa
Boiling point
329 - 363 °F
165 - 184 °C
Steam supply capacity
156.5 lbs/h
71 kg/h
Connection thread (on site)
½" internal thread
Supply lead Steam valve Length
19 11/16“
500 mm
Steam valve, steam filter and steam fancet must be provided on site.
The steam valve should be installed close to the steam connection. Note installation instructions for
steam-heated Miele tumble dryers.
Condensate
connection
Connection thread (on site) ½" internal thread
Steam valve, steam filter and steam faucet must be provided on-site.
Installation of the steam trap needs to allow complete drainage of the heater element during
machine downtime. This means, no condensate is left in the heater element. Installation of an
inverted bucket steam trap is recommended.
Air outlet
Max. nominal air flow in vented mode
39200 cu ft/h
1110 m³/h
Max. permissible pressure loss
6.3 psf
300 Pa
Connection on machine side (ext. diameter)
5 15/16
150 mm
Connection pipe provided on site (int. diameter)
5 15/16
150 mm
Max. temperature
176 °F
80 °C
As relative humidity inside the vent duct can be as high as 100%, suitable measures must be taken
to prevent a backflow of condensate into the machine.
Air intake
Standard connection: Air intake from installation site
Recommended unobstructed air intake into room
(corresponding to 3 times the vent cross-section of
machine)
82.31 in²
531 cm²
A sufficient supply of fresh air should be ensured to
replace the air extracted.
Alternative connection: Ducted air intake (from outside
building)
Connector on machine (int. diameter)
6 5/16
161 mm
Connection pipe provided on site (ext. diameter)
6 5/16
160 mm
Lid removal exposes live components! For safety reasons,
the pipe connected for central air intake should be at least
35 7/16” [900 mm] long and secured using two screws.
Installation plan: PT 8807 D