Loading ...
Loading ...
Loading ...
4
Install the guidance screen (wire rope lifting)
Wire Rod Lifting
Fasten the 2 mounting brackets to the screw by locking them with two M8 nuts.
Install the M5 bolts and nuts on the mounting ears of guidance screen.
Hang the induction screen on the M5 bolt and lock the M5 nut.
Installing the guidance screen (Wire rod lifting)
2.3.2 Power on
Connect the device to the network and power it on.
Power supply: 1 pc, 100–240 VAC.
Network interface: 1 pc, 10 M/100 M Ethernet port (RJ-45).
Loading ...
Loading ...
Loading ...